BE-CI MISSION

Our mission is to provide our clients with professional consulting and engineering services that consistently meet or exceed their expectations by delivering services to our clients that are consistent with our goals.

BE-CI GOALS

We will strive to be a leader in our industry by upholding the high professional standards of professional engineering.

We will assist our employees in achieving their highest personal and professional potential by maintaining an environment that promotes integrity, service, creativity, teamwork, continuing education, and professional affiliations.

We will focus our practice on problem solving for buildings in service after construction.

We will address the problems that are created by natural disaster, defective original construction, or just plain age.

+
If it's broken...

We will design a fix.

+
If it's old...

We will make it look and function like new.

+
If it's new...

We will make sure it works the way it was designed.

 

NEW INFRARED APPLICATIONS THAT DETECT MISSING STRUCTURAL REINFORCEMENTS

BE-CI uses infrared thermography to detect missing structural reinforcement in High Rise Buildings. Although Infrared Thermography has traditionally been used to trace moisture intrusion and electrical anomalies, BE-CI has developed a system to utilize this equipment to expose critical omissions of embedded structural reinforcement in High Rise Construction. These discoveries have provided identification of specific areas of omission so that the missing reinforcement steel and concrete grout can be replaced and the finishes repaired.

BE-CI has completed investigation and repairs on 6 major projects in Florida and Alabama and currently has two other High Rise projects prepared for restoration to begin. The photographs and infrared images being shown depict the accuracy of the BE-CI system to detect and locate the missing reinforcement. The dark vertical lines represent cells of the CMU that were properly filled while the light colored areas show absence of the reinforced grout or discontinuous application from floor to floor.

 

 

 

NEW TECHNOLOGY TO CONTROL CORROSION ON EXPOSED STRUCTURAL STEEL BRIDGES

BE-CI’S NEW PREVENTATIVE MAINTENANCE PROGRAMS FOR CONDOMINIUMS AND COMMERCIAL PROPERTIES

NEW DESIGNS TO PROVIDE PERMANENT STAGING ACCESS ON HIGH RISE BUILDINGS

ECONOMICAL DESIGNS TO REPLACE RUSTED STEEL PAN STAIRS WITH PRE-CAST CONCRETE UNITS

BE-CI ENGINEERS RAPPEL HIGH BUILDINGS TO GET FACE TO FACE WITH BUILDING ENVELOPE PROBLEMS

 

 

 

hit counters
website hit counter